← Residential (homeowners)Commercial / Contractors
← All projects
Modera St. Pete towers during construction
Residential & Commercial · High-riseCompleted

Modera

St. Petersburg, FL

444
VRF units
2
Towers (20 & 9 floors)
15
Person team

Two buildings, 20 and 9 floors, totaling 444 HVAC units on VRF (Variable Refrigerant Flow) systems: a common outdoor unit connected to multiple indoor units through insulated copper piping, with condensers on the roof. CEOS completed all copper refrigeration installation from the first floor to the roof of the 20th floor without leaks, and all machines are operational.

Scope

VRF copper refrigerant pipingRisers from 1st floor to 20th-floor roofRoof condensersIndoor units per room

Key results

  • Copper installation complete, no leaks
  • All machines operational
  • Completed in 1.1 years with a 15-person team

Photos

Have a job like this?

Get CEOS crews on it

Call, text or WhatsApp JP. Insured, COI ready.

More projects