← Residential (homeowners)Commercial / Contractors
← All projects
Channelside tower and wood-frame building in Tampa
Residential · Mixed-use high-riseCompletedJun 2022 – Jul 2023

The MAV – Channelside

Tampa, FL

324
Apartments
2
Buildings (20 & 5 stories)
1 yr
Execution

A 20-story tower and a 5-story wood-frame building in Channelside, Tampa (Channelside 1000 & 2000). CEOS ran the rough-in, copper and trim: ductwork, corridor systems, indoor units, air handlers with drains, fans, thermostats and rooftop condensers, connecting the copper for each of the 324 apartments to its condenser. Both buildings were delivered fully operational and passed all quality inspections.

Scope

Rough-inCopper lines to rooftop condensersDuctwork & ventilationCorridor systemsAHUs, drains & thermostatsTrim & startup

Key results

  • Full system installation from rough to startup
  • High-rise coordination with multiple trades
  • Passed all quality inspections; delivered on the GC's schedule

Photos

Have a job like this?

Get CEOS crews on it

Call, text or WhatsApp JP. Insured, COI ready.

More projects