← Residential (homeowners)Commercial / Contractors
← All projects
Have a job like this? More projects

Residential · Townhomes
Rotunda
Brandon, FL
11
Townhomes
1 mo
For two buildings
11 three-story townhomes in two buildings. CEOS installed the rough-in and copper, with each air handler in the third-floor attic distributing air through the townhome. Every phase was approved at inspection; both buildings took about one month.
Scope
Rough-inCopperAttic air handlers
Key results
- Every phase approved at inspection
Get CEOS crews on it
Call, text or WhatsApp JP. Insured, COI ready.



